Verified [portable] - Aqmos R2d272 Installation
: An open drain or wastewater connection (12 mm) must be accessible for regeneration.
: Secure the wastewater hose to the system's drain port with a hose clamp and lead it to your drain system.
Ensuring your is verified and functioning correctly is essential for maintaining a limescale-free home. This guide provides a comprehensive walkthrough for a successful setup of the water softener. 1. Site Preparation and Requirements aqmos r2d272 installation verified
: Tighten these connections hand-tight initially to allow for adjustment before final tightening.
: Attach the stainless steel hoses to the bypass. Ensure flat seals are correctly placed in the connections. : An open drain or wastewater connection (12
: Install the bypass valve on the back of the control head, securing it with the provided clips and screws.
: Requires a standard 230V/50Hz electrical socket nearby. This guide provides a comprehensive walkthrough for a
: Turn off the main water supply and drain the lines.